Hollywood, FL · All of South FloridaHollywood, FL · South Florida

Decks that stay cool underfoot

From $8 per sq ft1 to 3 daysno demolition

Poured rubber pool deck resurfacing in South Florida reads 99 F underfoot where tile reads 134 F and bare concrete reads 155 FOur decks read 99 F where bare concrete reads 155 F

We measure inside 24 hours and you get the written price the same day.

13 yearsteam experience
more than 1.6M sq ftinstalled internationally
2-yearworkmanship warranty
EN / ESbilingual crew
24 hoursto your free estimate
The cool test

99°F on our blend, 134°F on tile, 155°F on concrete

Bare feet standing all afternoon on our light blend rubber deck
99°Fstand on it all afternoon
A family walking barefoot across a rubber pool deck
Barefoot at midday, nobody hurries
Infrared thermometer reading 150 degrees on bare concrete
The gun does not negotiate. Bare slab in full afternoon sun, the light rubber beside it reads tens of degrees lower.
Bare feet on tiptoes on a hot tile pool deck
134°Ftile, kids sprint across it
Bare feet standing all afternoon on our light blend rubber deck
99°Fstand on it all afternoon
A family walking barefoot across a rubber pool deck
Barefoot at midday, nobody hurries
Infrared thermometer reThe gun does not negotiate. Bare slab in full afternoon sun, the light rubber beside it reads tens of degrees lower.igcaption><b>155<u>°F</u></b><i>bare concrete, same sun</i></figcaption></figure><figure class=Bare feet on tiptoes on a hot tile pool deck
134°Ftile, kids sprint across it

Measured on a 91 degree South Florida afternoon.See the arithmetic

What we do

1 crew for every surface

Materials supply and turnkey installation. Residential and commercial. HOAs, schools, daycares, parks and resorts.

Poured by this crew

Watch 1.6M sq ft of our work

1.6 million sq ft poured by this crew between 2013 and 2025, internationally. Our first Florida decks are being booked now.

Poured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool Surfacing
Poured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool SurfacingPoured in place rubber surfacing installed by B-Cool Surfacing
Free and no obligation

See your deck before you commit

  • ConsultationWe measure on site and answer everything
  • A sampleYour blend and your color in your own hand
  • A design projectYour space drawn in the finish you picked
Before and after

What we tear out, and what you walk on.

Drag the handle.

After, the same deck in poured rubberBefore, worn concrete pool deck ║ BeforeAfter
Crew grinding and priming the existing concrete deck1
Prep
Crew mixing and placing the rubber and binder2
Pour
Troweling the surface smooth at the pool edge3
Finish

One crew, one day, no demolition.

Before and after

Your before already exists

Send one photo and we set your after date.

Get my after date
Color Studio

Design your own blend

30 EPDM colors. Mix your own exclusive surface, free sample at your door.

Open the Color Studio

Free sample. 2 minutes.

║
What we install over

No demolition needed

Your existing surface is usually the perfect base, so we prep it and pour right over it.

Old grey concrete pool deck with hairline cracks

Old concrete

Even with hairline cracks, we grind and bridge them first.

Chalking acrylic Kool deck style coating

Kool deck and acrylics

Chalking or faded coatings take a fresh layer once we sound the deck.

Sound concrete pavers and tile patio surface

Pavers and tile

Stable pavers and tile become a seamless surface without tear-out.

Worn poured rubber surfacing from another installer

Aging rubber

Worn rubber from other installers is often topped, not torn out.

The short way to a number

Two fields and we call you back

A phone and a ZIP is all we need to book the measurement. We come out within 24 hours and hand you a fixed written price.

754-999-9766 Mon to Sat, 8am to 7pm. Se habla español.

✔ Free estimate ✔ No deposit ✔ No spam, ever

B-Cool crew installing stone carpet flooring by hand
Why rubber surfacing

Made for barefoot Florida living

  • ✓Cool underfoot. Rubber granules don't store heat the way concrete and pavers do, walk barefoot at noon.
  • ✓Slip-resistant when wet. Porous surface drains splash and rain instantly, no puddles around the pool.
  • ✓Soft on falls. The same impact-absorbing material used on professional playgrounds.
  • ✓Goes over existing concrete. Cracked deck? We resurface right over it, no demolition, no dumpsters.
  • ✓Any color or pattern. EPDM granules mix into custom designs, logos and safety zones.
How it works

From call to finished deck

Crew member measuring a pool deck with a laser1

Free on-site estimate

We visit within 24 hours, measure the area, check the base and hand you a fixed price.

Hands over a set of rubber granule colour samples2

Design and color choice

Pick colors, patterns and thickness. We repair the base so the surface holds for years.

Finished light sand rubber pool deck3

Installed in 1 to 3 days

Most home decks and playgrounds are poured and cured within days, ready to walk barefoot.

Rain sets the schedule

Poured rubber needs 3 dry days

Rainy season runs through October, so install slots move with the forecast. Measuring now costs nothing and holds your place in the queue.

Hold my slotFree measurement within 24 hours
Compare options

Rubber against the rest

What Florida homeowners actually compare when resurfacing a pool deck or patio.

Concrete paint

Concrete paint

  • ✕Hot
  • ✕Slick wet
  • ✕Hard falls
  • ✕Peels
  • ●Goes over slab
B-COOL rubber

B-COOL rubber

  • ✓Stays cool
  • ✓Grippy wet
  • ✓Soft falls
  • ✓Bridges cracks
  • ✓No demolition
Pavers

Pavers

  • ✕Very hot
  • ●Varies
  • ✕Hard falls
  • ●Shifts, weeds
  • ✕Needs demo
Tile

Tile

  • ✕Hot
  • ✕Slick wet
  • ✕Hard falls
  • ✕Cracks
  • ●Sometimes fits
Concrete paint

Concrete paint

  • ✕Heat underfootHot
  • ✕Slip when wetSlick
  • ✕Fall safetyHard
  • ✕CrackingPeels and cracks
  • ●Install over old concreteYes
B-COOL rubber

B-COOL rubber

  • ✓Heat underfootStays cool
  • ✓Slip when wetGrippy, drains through
  • ✓Fall safetyImpact-absorbing
  • ✓CrackingFlexes, bridges cracks
  • ✓Install over old concreteYes, no demolition
Pavers

Pavers

  • ✕Heat underfootVery hot
  • ●Slip when wetDepends on finish
  • ✕Fall safetyHard
  • ●CrackingShifts and weeds
  • ✕Install over old concreteUsually demo
Tile

Tile

  • ✕Heat underfootHot
  • ✕Slip when wetSlick
  • ✕Fall safetyHard
  • ✕CrackingCracks
  • ●Install over old concreteSometimes
Painted concrete deck surfaceConcrete paintPoured rubber granule surfaceB-COOL rubberConcrete paver surfacePaversPorcelain deck tile surfaceTile
Heat underfootHotStays coolVery hotHot
Slip when wetSlickGrippy, drains throughDepends on finishSlick
Fall safetyHardImpact-absorbingHardHard
CrackingPeels and cracksFlexes, bridges cracksShifts and weedsCracks
Install over old concreteYesYes, no demolitionUsually demoSometimes
Three ways to solve it

3 ways to fix a deck

Only 1 of them you pay for once

Poured in place rubber surfacing installed by B-Cool Surfacing
Tear it out

Tear out and pave

$25 to 40 per sq ft
  • ✕2 to 4 weeks of demo
  • ✕Hot and hard underfoot
  • ✕Weeds and settling pavers
  • ✕Permits and inspections
  • ✕Dumpsters on your lawn
  • ✕2x the cost of resurfacing
In 5 years you buy it again
Poured in place rubber surfacing installed by B-Cool Surfacing
What we do

Resurface your slab

from $8 per sq ft
  • ✓Ready in 1 to 3 days
  • ✓Cool and grippy barefoot
  • ✓2 year warranty
1 install and 1 bill
Book my free check
No deposit at the estimate
Poured in place rubber surfacing installed by B-Cool Surfacing
Coat it cheap

Cheap coating

$2 to 6 per sq ft
  • ✕Peels in 1 or 2 seasons
  • ✕Slick when wet
  • ✕No warranty or insurance
  • ✕Still hot at noon
  • ✕Looks patchy in 1 year
  • ✕Full strip before redoing
You redo it every other year
Zero-risk promises

5 promises in writing

Prefer to split the payment? We'll break it into two at no extra cost, no lender, no credit check, no interest.

FAQ

Questions we get asked

“You're new in Florida, why should I risk it?”

Straight answer. We are. B-Cool started operating in Florida in 2026. Every project in our gallery was installed by this crew, playgrounds, courts, pool surrounds, over 1.6 million sq ft, but in Europe, not in Broward. We won't pretend otherwise. Here's how we make it safe. You pay nothing at the estimate; full written warranty terms before any deposit; the deposit never exceeds 30%; you pay the balance only after walking the finished surface. If a Broward reference matters more than all of that, hire the guy who has one, we'd do the same.

How much does rubber surfacing cost in South Florida?

Installed pricing starts at $8 per sq ft, with base prep and a 2 year warranty included. You get a fixed number after a free on-site measurement within 24 hours, and if you have a comparable written quote, we'll beat it.

Does rubber surfacing get hot in the Florida sun?

It stays noticeably cooler than concrete, pavers or tile. Rubber granules don't accumulate heat the way stone does, which is why it's the go-to surface for barefoot zones around pools.

Can you install over my cracked concrete deck?

Yes, in most cases we install directly over existing concrete. The rubber layer flexes and bridges hairline cracks, and we repair the base where needed before pouring. No demolition, no dumpsters.

How long does the surface last?

The material is built for years of Florida sun and the promise we put in writing is the 2 year workmanship warranty, extended to 3 years under the current welcome offer. Worn or damaged spots are repaired locally without redoing the deck.

Is it safe for kids and playgrounds?

Yes, poured-in-place rubber is the standard safety surface for commercial playgrounds. Thickness is matched to equipment fall height, and the finished surface is built to the fall height of your equipment.

How fast can you install?

Free estimate within 24 hours; most residential projects are installed in 1 to 3 days. The surface is walkable after curing, typically 24 to 48 hours depending on weather.

Your free Deck Check

What actually happens at the visit

A 30-minute visit. No one needs to come inside your house.

What does not happen. no pressure to sign that day, no follow-up calls if you tell us no.

Not ready for a visit?

Text us a photo

Stand at your slider, take one photo of the whole deck, add your ZIP. You get a ballpark price back the same day, usually within 2 hours (8am to 7pm Mon to Sat). No visit, no name, no email. If the number works, then we come measure. If it doesn't, you've lost 20 seconds.

Text a photo, get a price WhatsApp a photo
Kool deck chalking or going hollow? That is the most common surface we replace in South Florida. Here is how to tell chalking from delamination and what it costs to fix.
Free quote

Get your fixed price

Tell us about your project, we measure on-site, you get a fixed quote. No obligation, no pressure.

Free measurement within 24 hoursNo deposit at the estimate.
Fixed written priceThe quote you sign is the invoice you pay.
1 to 3 days on siteWalkable after 24 to 48 hours of curing.
2 year workmanship warrantyIn the contract before you pay anything and extended to 3 years under the current offer.
  • ✔  Free on-site measurement across Broward, Miami‑Dade and Palm Beach
  • ✔  Fixed quote, the number we give is the number you pay
  • ✔  English and Spanish speaking crew
  • ✔  2-year warranty, 3 years for founding customers
  • ✔  No deposit at the estimate; never more than 30% at signing
  • ✔  Balance due only after you walk the finished surface

Step 1 of 2, your deck

30 seconds, no email needed yet

Not sure? A typical pool deck is 500 to 900 sq ft, just guess, we measure on site.
Call Photo quote Book visit