We resurface pool decks and patios in Miami from 8 dollars per sq ft installed, 28 minutes from our Hollywood shop. The job takes 1 to 3 days over your existing concrete and measurement is free within 24 hours.
Poured rubber and stone carpet surfaces. 1.6 million sq ft placed by this crew since 2013, internationally.
Local facts, not general promises








The water table sits close to the surface here, so slabs move with the rainy season instead of staying where a drawing assumes they will. A deck that reads level in March can hold a shallow pond in July. That is a prep problem before it is a surfacing problem, and it is the main reason two Miami quotes for the same square footage come back at different numbers. Correcting a low spot that ponds water is separate work, and we price it as a line you can see rather than burying it in the rate. Cracks get treated the same way. A hairline crack that has stopped moving is bridged by the flexible layer and stays bridged. A crack still working gets ground, filled and primed first, and where a slab has dropped onto a failed base we flag it at the free measurement. Bare concrete in that same afternoon sun reads 155 F. Getting the base right is what lets the finished surface read 99.
Thirty percent of the housing stock here went up before 1960, yet a good share of the deck work we quote in Brickell and Edgewater sits high above street level on podium and rooftop amenity floors. Those jobs are won or lost on access. Material moves in a service elevator inside a booked window. Mixing happens where building management says it can happen. Where the freight car will not take a loaded barrow, everything travels up in hand loads and the crew plans the whole day around it. None of that changes the rate per square foot. It changes the schedule, and we would rather say so before you sign than after. Permitting follows the same logic. The city exempts floor finishes only inside single family homes and duplexes, so an outdoor slab or a pool deck gets a permit pulled, and a building on the Coral Gables or Key Biscayne side of a boundary answers to its own department entirely.
Poured rubber starts at 8 dollars per sq ft installed. The number depends on how much prep your slab needs and how many colors you pick. You get a fixed written price after a free measurement, and if you already hold a comparable written quote we will beat it.
The city publishes an exempt work list. Floor finishes are exempt only inside single family homes and duplexes. Outdoor slabs and pool decks are not on that list, so we pull a permit. Building Department phone 305 416 1100.
In most cases yes. Poured rubber bonds to the existing slab and bridges hairline cracks instead of telegraphing them. We grind, fill and prime first. If a slab has moved badly or sits on a failed base, we say so at the estimate rather than pour over a problem.
A typical residential deck runs 1 to 3 days on site and is walkable 24 to 48 hours after the final pour. Rain moves the schedule, since poured rubber needs dry weather. We book around the forecast rather than promise a date we cannot hold.
Yes. We write specification level proposals a board can vote on, carry insurance and provide a certificate on request, and phase work so an amenity deck stays partly open. For condo pool decks we also flag where state pool code limits porous surfaces, before anyone signs.
No deposit at the estimate. We speak English and Spanish.
Free on-site measurement within 24 hours. No obligation.