We resurface pool decks and patios in Boca Raton from 8 dollars per sq ft installed, 42 minutes from our Hollywood shop. The job takes 1 to 3 days over your existing concrete and measurement is free within 24 hours.
42 minutes from our shop in Hollywood.
Local facts, not general promises








Poured rubber and stone carpet surfaces. 1.6 million sq ft placed by this crew since 2013, internationally.
Architectural review is the normal path in Boca Raton rather than the exception, and boards here want a written scope in hand before they approve anything. So the proposal gets written for them first. The document says what goes down, how thick, which granule and which colors, in what order, on which days, and what the 2 year workmanship warranty actually covers, with the warranty terms attached instead of promised on request.
A committee can read that, vote on it and file it without a second meeting. Homeowners receive the identical document, because the detail that satisfies a committee is the detail that ends an argument in year two. Timing lives in there as well, since an amenity deck cannot go dark for a week. Work moves in sections with a route held open, and each section becomes walkable 24 to 48 hours after its own pour. Our crew has poured seamless surfaces since 2013 and now works out of Hollywood, and review has never been the step that held a job up.
Housing built between the mid seventies and the nineties leaves a city full of decks arriving at end of life together, which turns this into a decision about cycles rather than about one summer. Another thin coating buys a few seasons and then asks to be done over, and salt air off the Intracoastal shortens every one of those seasons, because it works on concrete in each month of the year and not only when a storm comes through. Poured rubber is the other route. It goes over the slab you already own with nothing torn out, it is walkable 24 to 48 hours after the final pour, and the workmanship is warranted for 2 years in the contract before you pay anything. Prep is where your number gets decided. Cleaning and priming sits at the bottom, grinding a failed coating off sits higher, and underneath both the rate reads 8 dollars per sq ft installed, 42 minutes from our shop.
Poured rubber starts at 8 dollars per sq ft installed. The number depends on how much prep your slab needs and how many colors you pick. You get a fixed written price after a free measurement, and if you already hold a comparable written quote we will beat it.
It depends on the municipality and on whether the work is like for like. We confirm the rule with your city before the job and state it in writing in your scope.
In most cases yes. Poured rubber bonds to the existing slab and bridges hairline cracks instead of telegraphing them. We grind, fill and prime first. If a slab has moved badly or sits on a failed base, we say so at the estimate rather than pour over a problem.
On a 91 degree afternoon a bare concrete deck hands your foot about 155 degrees. A light sand rubber deck hands it about 99. The full table with the arithmetic is here.
A typical residential deck runs 1 to 3 days on site and is walkable 24 to 48 hours after the final pour. Rain moves the schedule, since poured rubber needs dry weather to cure properly.
Free on-site measurement within 24 hours. No obligation.