Rubber pool deck at a West Palm Beach villa with an arched loggia
Palm Beach County

Rubber pool decks in West Palm Beach

We resurface over your existing slab. No demolition.

55 minutes from our shop in Hollywood.

We pour B-Cool on pool decks and patios in West Palm Beach with poured in place rubber. Installed price starts at 8 dollars per sq ft, the job takes 1 to 3 days and the surface is walkable in 24 to 48 hours. We pour over your existing concrete, so nothing gets torn out. Measurement is free and the quote is fixed.
from $8per sq ft installed
1 to 3 dayson site
24 hoursto your free measurement
2 yearsworkmanship warranty
We cover the whole of Palm Beach County.Nearby we also work in Boca Raton, Delray Beach, Boynton Beach, Wellington.

Why slabs fail in West Palm Beach

Local facts, not general promises

Rubber pool deck at a South Florida home in West Palm BeachSugar sand rubber deck at a villa pool in West Palm BeachFinished terracotta rubber pool deck with loungers in West Palm BeachStone carpet pool deck at a South Florida home in West Palm BeachLanai floor in seamless rubber in West Palm BeachOceanfront condo amenity deck in rubber in West Palm BeachPrivate court finished in poured rubber in West Palm BeachPlayground on poured rubber safety surfacing in West Palm Beach

Poured rubber and stone carpet surfaces. 1.6 million sq ft placed by this crew since 2013, internationally.

High water table lifted the last coating

There is a reason the previous surface failed, and in West Palm Beach it is usually moisture rather than workmanship. The water table sits high. Concrete above it never stops giving off vapour, and a film applied before the slab has released that vapour gets pushed off from underneath inside a season or two. The homeowner reads that as a bad product. It was a bad moment. Prep on these decks therefore begins with the slab and not with the color. Old coating comes off until the concrete under it is sound, adhesion gets tested wherever the surface looks doubtful, cracks are opened, filled and primed, and only then does anything go down. What goes down is porous, so vapour leaving the slab has somewhere to travel instead of gathering underneath a sealed film. That single difference is why a poured deck holds where three separate coats of acrylic did not.

Pre war slabs beside eighties condo decks

West Palm Beach keeps both ends of the century inside the same few blocks. A slab poured before the war is thin, hand finished and carrying several generations of paint. A condo deck from the eighties is thicker and flatter but finished in Kool deck that ran out of service life a long while ago, and on an unshaded west facing terrace it chalks out fast, because afternoon sun does damage that morning sun never gets around to. Same rate, different hours. The old slab wants patient grinding and testing before anyone talks about finish. The chalking condo deck wants that dust taken off properly before priming, which is the step most repaint quotes leave out quietly and charge you for again in year three. Both end up under the same seamless layer, both run 1 to 3 days on site, both carry the 2 year workmanship warranty, and both get one fixed number after a free measurement.

West Palm Beach neighborhoods we resurface decks in

Permits in West Palm Beach

Permit officeWhether a like for like resurfacing needs a permit depends on your municipality. We check your city before the work starts and put the answer in your written scope, so nothing stops mid job.
Our schedule55 minutes up from our Hollywood shop. Most West Palm Beach decks get measured the same week you call.

Questions from West Palm Beach

How much does a rubber pool deck cost in West Palm Beach?

Poured rubber starts at 8 dollars per sq ft installed. The number depends on how much prep your slab needs and how many colors you pick. You get a fixed written price after a free measurement, and if you already hold a comparable written quote we will beat it.

Do I need a permit to resurface a pool deck in West Palm Beach?

It depends on the municipality and on whether the work is like for like. We confirm the rule with your city before the job and state it in writing in your scope.

Can you pour over cracked concrete?

In most cases yes. Poured rubber bonds to the existing slab and bridges hairline cracks instead of telegraphing them. We grind, fill and prime first. If a slab has moved badly or sits on a failed base, we say so at the estimate rather than pour over a problem.

How hot does it get underfoot?

On a 91 degree afternoon a bare concrete deck hands your foot about 155 degrees. A light sand rubber deck hands it about 99. The full table with the arithmetic is here.

How long does the job take?

A typical residential deck runs 1 to 3 days on site and is walkable 24 to 48 hours after the final pour. Rain moves the schedule, since poured rubber needs dry weather to cure properly.

Get your fixed quote

Free on-site measurement within 24 hours. No obligation.

Free measurement within 24 hoursNo deposit at the estimate.
Fixed written priceThe quote you sign is the invoice you pay.
1 to 3 days on siteWalkable after 24 to 48 hours of curing.
2 year workmanship warrantyIn the contract before you pay anything.

We pour 3 decks a week. Slots this month go in Deck Check order.

✔ Free estimate ✔ No spam, ever ✔ Se habla español

CallPhoto quoteBook visit