We resurface over your existing slab. No demolition.
46 minutes from our shop in Hollywood.
Local facts, not general promises








Poured rubber and stone carpet surfaces. 1.6 million sq ft placed by this crew since 2013, internationally.
Two kinds of slab sit under this city. The nineteen fifties bungalows near the beach were poured thin and have had seventy years of weather working on them, while the eighties communities west of I-95 went down to a later standard and have often never been resurfaced either. Both take salt spray and afternoon storms in the same week, and the two do different damage. Salt gets into the pores of an old slab and pushes the face apart from the inside, which shows up as spalling and a chalky surface long before anything cracks.
Water that cannot leave a deck finds the weakest seam, sits in it, and lifts whatever was painted on top. Prep answers both. We grind back to sound concrete, treat and bridge the cracks, then prime so the new layer bonds to the slab rather than resting on a tired coating. What goes down after that is porous by design, so a downpour drains through instead of pooling by the pool edge.
Rental and seasonal homes need a surface that survives being left alone for months, and that changes what a good deck is more than most owners expect. Nobody is there to push standing water off a low spot. Nobody is there to reseal anything on schedule. So the surface has to be the maintenance plan by itself. Poured rubber is seamless, which removes the joints where weeds and mould take hold in an empty house, and it needs no yearly seal coat to keep working. For owners who are out of state we start from photographs of the slab and a rough footprint, talk the scope through, then hold the fixed number until somebody can be on site for the free measurement. The work itself is 1 to 3 days and the deck is walkable 24 hours to 48 hours after the last pour, which fits between one tenant and the next. The 2 year workmanship warranty follows the address.
Poured rubber starts at 8 dollars per sq ft installed. The number depends on how much prep your slab needs and how many colors you pick. You get a fixed written price after a free measurement, and if you already hold a comparable written quote we will beat it.
It depends on the municipality and on whether the work is like for like. We confirm the rule with your city before the job and state it in writing in your scope.
In most cases yes. Poured rubber bonds to the existing slab and bridges hairline cracks instead of telegraphing them. We grind, fill and prime first. If a slab has moved badly or sits on a failed base, we say so at the estimate rather than pour over a problem.
On a 91 degree afternoon a bare concrete deck hands your foot about 155 degrees. A light sand rubber deck hands it about 99. The full table with the arithmetic is here.
A typical residential deck runs 1 to 3 days on site and is walkable 24 to 48 hours after the final pour. Rain moves the schedule, since poured rubber needs dry weather to cure properly.
Free on-site measurement within 24 hours. No obligation.