Resurfacing and Repair, B-Cool Surfacing
Resurfacing and repair

Don't demolish it. Resurface it.

Cracked concrete, faded Kool Deck and worn rubber get resurfaced from 8 dollars per sq ft installed, in 1 to 3 days with no tear out. The old surface is ground back to sound concrete and a new seamless layer poured on top.

Updated September 2026

We pour over your existing deck.Nothing is dug up and your sprinkler lines stay where they are.

Resurfacing means the old surface is ground back to sound concrete, the cracks are treated and bridged, and a new seamless layer is poured on top. It works when the slab itself is sound and cracks are hairline to about an eighth of an inch. From 8 dollars per sq ft, 1 to 3 days, no tear out.

99°your foot on our light blend, where concrete hands it155°on a 91 degree Florida afternoon.See the arithmetic
Sound familiar?
  • Replacement quotes that start with jackhammers and a dumpster
  • A patchwork of previous repairs that keeps cracking back
  • An old rubber surface shedding granules because of a failed binder
What we do instead
  • ✓Over existing surfaces. concrete, Kool Deck, pavers and stable asphalt all take a new layer.
  • ✓Crack treatment first. we grind, fill and prime, the new surface doesn't inherit old cracks.
  • ✓Old rubber rescue. failed PIP from other installers can often be topped, not torn out.
  • ✓Fraction of replacement cost. no demolition, no haul-away, no weeks of construction.
Not ready for a visit? Text one photo of your surface and your ZIP to 754-999-9766, ballpark price back within about 2 hours (8am to 7pm Mon to Sat). No name, no email.
What the finished surface looks like
Cracked pool deck before resurfacingFresh rubber going down over the old slabThe same deck finished in poured rubberOld pool deck coating peeling before resurfacingRemoving failed tile before resurfacingThe same deck resurfaced in poured rubberPoured rubber laid over the existing slabClose view of the finished rubber surface

Poured rubber and stone carpet surfaces. 1.6 million sq ft placed by this crew since 2013, internationally.

How it works
Crew member measuring a pool deck with a laser1

Free on-site estimate

We visit within 24 hours, measure and give you a fixed quote.

Hands over a set of rubber granule colour samples2

Design and prep

Colors and thickness chosen; base repaired and primed to bond for years.

Finished light sand rubber pool deck3

Installation

Poured, cured and ready to use, most projects in 1 to 3 days.

Transparent pricing

How much does it cost?

Completed poured rubber pool deck
The same slab once the surface is closed and cured.
from $8per sq ft installed
✔ Base prep, crack treatment and priming included
✔ 2-year workmanship warranty included
✔ Spot repairs from $450
Already collecting quotes? Bring them to our visit. We'll go through them line by line, where they're padded, where they're fair, and where someone left out base prep that costs you in year two. You keep that breakdown either way. Then bring any written quote for comparable scope from a licensed South Florida installer and we beat it in writing, on the spot. Final fixed number after your free Deck Check within 24 hours.
FAQ
Can you repair a rubber surface installed by another company?

Usually yes. If the base layer is sound, we clean, re-bind and top it with a fresh wear layer. If the binder has failed throughout, we'll tell you honestly and quote a full resurface.

My pool deck is Kool deck and it's chalking, can you go over it?

Yes, after adhesion testing and surface prep, poured rubber bonds over old Kool deck and acrylic coatings.

Is resurfacing cheaper than replacement?

Significantly, you skip demolition, debris haul-away and new slab work. Most resurfacing projects finish in 1 to 3 days.

How do you handle cracks?

Stable hairline cracks are bridged by the flexible rubber layer; active or structural cracks are ground, filled and primed first, we flag anything structural during the free assessment.

What are some common problems with pool decks?

Five problems account for nearly every South Florida pool deck we get called out to. Cracks that keep coming back, because the crack lives in the slab and the topping only shows it to you. Chalking, where the surface powders off on your hand. Delamination, where the topping sounds hollow when tapped. Spalling and popped edges at the coping where splash sits. And heat, with bare concrete reading 155 F in our field readings. The first three are bond failures and cannot be painted over. B-Cool measures on site free within 24 hours and tells you which of them you actually have.

What is the average cost of resurfacing a pool deck?

Resurfacing runs 8 to 14 dollars per sq ft installed with B-Cool, with prep, primer, material, labor and a 2 year workmanship warranty included. The word average hides the only variable that matters, which is prep. A sound slab needs cleaning and priming and sits at the low end. A slab with a failed acrylic topping needs grinding first, and grinding is hours of labor, dust control and disposal. Cracks, a low spot that ponds water and a chalking Kool deck all push the same deck up the band. We measure on site free within 24 hours and hand you 1 fixed written number.

What is the best material to use for resurfacing a pool deck?

Poured rubber surfacing is what we use on Florida pool decks, and heat is the reason. It measured 99 F in our field readings on an afternoon when rubber tile read 134 F and bare concrete read 155 F. It is porous, so splash and rain drain through instead of standing, and it grips soaking wet. Because it is elastic and seamless it bridges hairline slab movement instead of telegraphing it, which is why the crack that comes back through paint every year stops showing. Stone carpet is the alternative where a client wants a natural stone look with the same drainage.

What is the best way to resurface a pool deck?

The best way starts with 1 honest question, whether the existing surface is still bonded. Tap the deck with a broom handle. A dull hollow note means the topping has let go of the slab, and every shortcut laid over it will fail with it. Sound topping gets cleaned, its cracks treated and the slab primed. Failed topping gets ground back to sound concrete first, and that grinding is the line between a resurface that lasts and one that peels. Only then does the new layer go down, poured seamless over 1 to 3 days and walkable in 24 to 48 hours.

Kool deck chalking or going hollow? That is the most common surface we replace in South Florida. Here is how to tell chalking from delamination and what it costs to fix.

Cool deck crack triage is here.

Epoxy resurfacing is explained here.

Get your fixed quote

Free on-site measurement within 24 hours. No obligation.

Free measurement within 24 hoursNo deposit at the estimate.
Fixed written priceThe quote you sign is the invoice you pay.
1 to 3 days on siteWalkable after 24 to 48 hours of curing.
2 year workmanship warrantyIn the contract before you pay anything.

We pour 3 decks a week. Slots this month go in Deck Check order.

✔ Free estimate ✔ No spam, ever ✔ Se habla español

CallPhoto quoteBook visit