How our surfaces actually work, systems, thicknesses, materials.
Every surface on this site is poured on your existing slab, not laid in tiles and not torn out first. Rubber granule or stone aggregate is mixed with binder on site, spread to an agreed depth and cured into one sheet with no joints. These pages show what goes into each build, how thick it needs to be and what the base has to look like before we start.
We prep the base ourselves.That is the step cheap installs skip and it is why they fail in the first year.
Free on-site measurement within 24 hours. No obligation.