We resurface over your existing slab. No demolition.
35 minutes from our shop in Hollywood.
Local facts, not general promises








Poured rubber and stone carpet surfaces. 1.6 million sq ft placed by this crew since 2013, internationally.
Doral went up from the nineteen nineties onward on tight lots. That shows in the backyard. Decks are compact, the pool sits close to the house, and the only way in is a side gate. Access drives the day. If the gate is narrower than the mixer, the mix comes through in buckets and the crew day gets built around that, which is a conversation for the measurement and not for the morning of the work. Compact cuts the other way too. A small deck still needs the same setup, the same cure time and the same clean up as a big one, so we price it as a job rather than as a pile of square feet, and you hear that number before anything starts. The rate itself does not move. Poured rubber in Doral starts from 8 dollars per sq ft installed exactly as it does anywhere else, and prep decides where inside the range you land.
Townhome communities need a plan that keeps the neighbors walking. We pour in sections, hold a route open to every door while the strip behind it cures, and post which strip is closed on which day. One deck takes 1 to 3 days on site and turns walkable 24 to 48 hours past its last pour, so a phased run reads as a short sequence rather than a shutdown. The language part is not a courtesy line at the bottom of a page. In Doral the entire job is discussed in Spanish, from the first call through the measurement, the written scope, the color choice and the walkthrough at the end. The crew standing in your yard speaks it. The document you sign exists in it. Nobody in this city should have to hand a contractor quote to a relative for translation before deciding whether it is fair.
Poured rubber starts at 8 dollars per sq ft installed. The number depends on how much prep your slab needs and how many colors you pick. You get a fixed written price after a free measurement, and if you already hold a comparable written quote we will beat it.
It depends on the municipality and on whether the work is like for like. We confirm the rule with your city before the job and state it in writing in your scope.
In most cases yes. Poured rubber bonds to the existing slab and bridges hairline cracks instead of telegraphing them. We grind, fill and prime first. If a slab has moved badly or sits on a failed base, we say so at the estimate rather than pour over a problem.
On a 91 degree afternoon a bare concrete deck hands your foot about 155 degrees. A light sand rubber deck hands it about 99. The full table with the arithmetic is here.
A typical residential deck runs 1 to 3 days on site and is walkable 24 to 48 hours after the final pour. Rain moves the schedule, since poured rubber needs dry weather to cure properly.
Free on-site measurement within 24 hours. No obligation.