We resurface over your existing slab. No demolition.
10 minutes from our shop in Hollywood.
Local facts, not general promises








Poured rubber and stone carpet surfaces. 1.6 million sq ft placed by this crew since 2013, internationally.
Nothing in the county eats a surface like salt coming straight off the ocean. It is not only the storms. A fine salt film lands on an oceanfront deck every single day, works into a Kool deck that has begun to dust or into a tired acrylic, and sits in the pores. Prime over that film and nothing bonds, whatever the datasheet promises. So on a Hallandale Beach deck the wash and the adhesion test are not a formality, they are the job. We take the surface back until it is clean and sound, then prime, then pour. The wear layer itself is EPDM granule in a UV and moisture stable binder, which is why we will put a 2 year workmanship warranty on a deck this exposed and sleep fine. Salt does not degrade the granule the way it degrades a painted film. An installer who quotes this deck with no prep line is quoting a repaint.
An oceanfront amenity deck cannot close for a week. Residents come down every morning and they come down barefoot, and those two facts drive the plan. First, phasing. We pour in sections and keep a clear walking route to the water at all times, so the pool stays open while the deck is rebuilt around it. A residential deck runs 1 to 3 days on site, and a phased amenity deck stacks those days into a sequence the board can post for residents. Second, temperature. On a hot afternoon bare concrete hands a bare foot around 155 F and a dark paver can reach 155 F, while a light sand poured rubber deck sits near 99 F. On a surface people use every day of the year, that gap is the whole argument. We are 10 minutes up from the shop, so the crew starts early and no half day is lost getting here.
Poured rubber starts at 8 dollars per sq ft installed. The number depends on how much prep your slab needs and how many colors you pick. You get a fixed written price after a free measurement, and if you already hold a comparable written quote we will beat it.
It depends on the municipality and on whether the work is like for like. We confirm the rule with your city before the job and state it in writing in your scope.
In most cases yes. Poured rubber bonds to the existing slab and bridges hairline cracks instead of telegraphing them. We grind, fill and prime first. If a slab has moved badly or sits on a failed base, we say so at the estimate rather than pour over a problem.
On a 91 degree afternoon a bare concrete deck hands your foot about 155 degrees. A light sand rubber deck hands it about 99. The full table with the arithmetic is here.
A typical residential deck runs 1 to 3 days on site and is walkable 24 to 48 hours after the final pour. Rain moves the schedule, since poured rubber needs dry weather to cure properly.
Free on-site measurement within 24 hours. No obligation.