We resurface over your existing slab. No demolition.
40 minutes from our shop in Hollywood.
Local facts, not general promises
Poured rubber starts at 8 dollars per sq ft installed. The number depends on how much prep your slab needs and how many colors you pick. You get a fixed written price after a free measurement, and if you already hold a comparable written quote we will beat it.
It depends on the municipality and on whether the work is like for like. We confirm the rule with your city before the job and state it in writing in your scope.
In most cases yes. Poured rubber bonds to the existing slab and bridges hairline cracks instead of telegraphing them. We grind, fill and prime first. If a slab has moved badly or sits on a failed base, we say so at the estimate rather than pour over a problem.
On a 91 degree afternoon a bare concrete deck hands your foot about 134 degrees. A light sand rubber deck hands it about 99. The full table with the arithmetic is here.
A typical residential deck runs 1 to 3 days on site and is walkable 24 to 48 hours after the final pour. Rain moves the schedule, since poured rubber needs dry weather to cure properly.