Rubber pool deck in Plantation, Florida
Broward County

Rubber pool decks in Plantation

We resurface over your existing slab. No demolition.

25 minutes from our shop in Hollywood.

We pour B-Cool on pool decks and patios in Plantation with poured in place rubber. Installed price starts at 8 dollars per sq ft, the job takes 1 to 3 days and the surface is walkable in 24 to 48 hours. We pour over your existing concrete, so nothing gets torn out. Measurement is free and the quote is fixed.
from $8per sq ft installed
1 to 3 dayson site
24 hoursto your free measurement
2 yearsworkmanship warranty
We cover the whole of Broward County.Nearby we also work in Hollywood, Fort Lauderdale, Pembroke Pines, Miramar.

Why slabs fail in Plantation

Local facts, not general promises

Rubber pool deck at a South Florida home in PlantationSugar sand rubber deck at a villa pool in PlantationFinished terracotta rubber pool deck with loungers in PlantationStone carpet pool deck at a South Florida home in PlantationLanai floor in seamless rubber in PlantationOceanfront condo amenity deck in rubber in PlantationPrivate court finished in poured rubber in PlantationPlayground on poured rubber safety surfacing in Plantation

Poured rubber and stone carpet surfaces. 1.6 million sq ft placed by this crew since 2013, internationally.

Leaf litter and drainage on Plantation decks

Mature tree cover is the reason people buy in Plantation and the reason their deck surface gives up early. Shade keeps a slab damp long after the rain has stopped, leaves sit exactly where they fall, and the tannin stains whatever is underneath them. Sealed concrete and painted deck coatings hold that water on top, and the film starts letting go from the underside where you cannot see it happening. Poured rubber is open. Water moves down through the surface and the deck dries between afternoon showers instead of staying wet under the leaf pile. Sweeping it hard does not scrub off a coating, because there is no coating to scrub. What we do check on a shaded slab out here is where the water actually ends up. If a back corner ponds, correcting that low spot is real work and it gets its own line on your estimate instead of hiding inside the rate.

Plantation Acres lots priced by the foot

Out in Plantation Acres the pool deck is rarely the biggest number on the estimate. The driveway runs the length of the lot, the walkway out to the pool is a job on its own, and the whole thing went down in different decades, which is why a lump sum from someone who eyeballed it from the street tells you nothing. We measure each surface separately and price them from 8 dollars per sq ft installed, so you can see what the walkway costs against what the deck costs and trim the scope yourself if you want to. Doing it in one mobilization beats calling us back next spring for the driveway, because setup and cure time get paid for once instead of twice. Access counts on these lots too. When the only route to the back is a narrow side gate, the mixer walks rather than rolls and that shows up in the hours.

Plantation neighborhoods we resurface decks in

Permits in Plantation

Permit officeWhether a like for like resurfacing needs a permit depends on your municipality. We check your city before the work starts and put the answer in your written scope, so nothing stops mid job.
Our schedule25 minutes up from our Hollywood shop. Most Plantation decks get measured the same week you call.

Questions from Plantation

How much does a rubber pool deck cost in Plantation?

Poured rubber starts at 8 dollars per sq ft installed. The number depends on how much prep your slab needs and how many colors you pick. You get a fixed written price after a free measurement, and if you already hold a comparable written quote we will beat it.

Do I need a permit to resurface a pool deck in Plantation?

It depends on the municipality and on whether the work is like for like. We confirm the rule with your city before the job and state it in writing in your scope.

Can you pour over cracked concrete?

In most cases yes. Poured rubber bonds to the existing slab and bridges hairline cracks instead of telegraphing them. We grind, fill and prime first. If a slab has moved badly or sits on a failed base, we say so at the estimate rather than pour over a problem.

How hot does it get underfoot?

On a 91 degree afternoon a bare concrete deck hands your foot about 155 degrees. A light sand rubber deck hands it about 99. The full table with the arithmetic is here.

How long does the job take?

A typical residential deck runs 1 to 3 days on site and is walkable 24 to 48 hours after the final pour. Rain moves the schedule, since poured rubber needs dry weather to cure properly.

Get your fixed quote

Free on-site measurement within 24 hours. No obligation.

Free measurement within 24 hoursNo deposit at the estimate.
Fixed written priceThe quote you sign is the invoice you pay.
1 to 3 days on siteWalkable after 24 to 48 hours of curing.
2 year workmanship warrantyIn the contract before you pay anything.

We pour 3 decks a week. Slots this month go in Deck Check order.

✔ Free estimate ✔ No spam, ever ✔ Se habla español

CallPhoto quoteBook visit