Local facts, not general promises








Poured rubber and stone carpet surfaces. 1.6 million sq ft placed by this crew since 2013, internationally.
Open up an old Pompano Beach deck from the fifties or sixties and you rarely find bare concrete waiting. There is usually a spray deck over a paint over whatever the original finish was, each layer applied because the last one failed and nobody wanted to pay for grinding. That stack is the entire reason prep costs what it costs. A new surface bonded to a failing old surface fails right along with it, so we grind the dead material back to sound concrete, test adhesion anywhere we are unsure, then fill and prime. This is the honest answer to why the rate begins at 8 dollars per sq ft instead of sitting at one flat number for everybody. A clean slab wants cleaning and priming. A three coating slab wants hours of grinding first. We tell you which one you own at the estimate and put it in writing, not after the crew is already parked out front.
Beachside is a different animal from inland Pompano. Salt air, blown sand and unbroken sun work on a surface together, and sand is the part owners underestimate. Every wet foot crossing that deck carries grit, and grit turns a thin acrylic film into dust far faster than the sun alone ever would. Poured rubber has body to it. The wear layer is granule all the way through, not a skin painted over concrete, so abrasion takes off nothing anyone can see from a lounger. Salt does not attack it and the binder is moisture stable, which counts when your deck wakes up damp with spray most mornings. Up in the towers the constraint is logistics rather than chemistry. A service elevator window decides when material can move, and that shifts the day we book you rather than the price per foot we already quoted.
Poured rubber starts at 8 dollars per sq ft installed. The number depends on how much prep your slab needs and how many colors you pick. You get a fixed written price after a free measurement, and if you already hold a comparable written quote we will beat it.
It depends on the municipality and on whether the work is like for like. We confirm the rule with your city before the job and state it in writing in your scope.
In most cases yes. Poured rubber bonds to the existing slab and bridges hairline cracks instead of telegraphing them. We grind, fill and prime first. If a slab has moved badly or sits on a failed base, we say so at the estimate rather than pour over a problem.
On a 91 degree afternoon a bare concrete deck hands your foot about 155 degrees. A light sand rubber deck hands it about 99. The full table with the arithmetic is here.
A typical residential deck runs 1 to 3 days on site and is walkable 24 to 48 hours after the final pour. Rain moves the schedule, since poured rubber needs dry weather to cure properly.