Rubber pool deck in Pompano Beach, Florida
Broward County

Rubber pool decks in Pompano Beach

We resurface over your existing slab. No demolition.

25 minutes from our shop in Hollywood.

We pour B-Cool on pool decks and patios in Pompano Beach with poured in place rubber. Installed price starts at 8 dollars per sq ft, the job takes 1 to 3 days and the surface is walkable in 24 to 48 hours. We pour over your existing concrete, so nothing gets torn out. Measurement is free and the quote is fixed.
from $8per sq ft installed
1 to 3 dayson site
24 hoursto your free measurement
2 yearsworkmanship warranty
We cover the whole of Broward County.Nearby we also work in Hollywood, Fort Lauderdale, Pembroke Pines, Miramar.

Why slabs fail in Pompano Beach

Local facts, not general promises

Rubber pool deck at a South Florida home in Pompano BeachSugar sand rubber deck at a villa pool in Pompano BeachFinished terracotta rubber pool deck with loungers in Pompano BeachStone carpet pool deck at a South Florida home in Pompano BeachLanai floor in seamless rubber in Pompano BeachOceanfront condo amenity deck in rubber in Pompano BeachPrivate court finished in poured rubber in Pompano BeachPlayground on poured rubber safety surfacing in Pompano Beach

Poured rubber and stone carpet surfaces. 1.6 million sq ft placed by this crew since 2013, internationally.

Three coatings deep on Pompano Beach slabs

Open up an old Pompano Beach deck from the fifties or sixties and you rarely find bare concrete waiting. There is usually a spray deck over a paint over whatever the original finish was, each layer applied because the last one failed and nobody wanted to pay for grinding. That stack is the entire reason prep costs what it costs. A new surface bonded to a failing old surface fails right along with it, so we grind the dead material back to sound concrete, test adhesion anywhere we are unsure, then fill and prime. This is the honest answer to why the rate begins at 8 dollars per sq ft instead of sitting at one flat number for everybody. A clean slab wants cleaning and priming. A three coating slab wants hours of grinding first. We tell you which one you own at the estimate and put it in writing, not after the crew is already parked out front.

Salt and sand on Pompano Beach decks

Beachside is a different animal from inland Pompano. Salt air, blown sand and unbroken sun work on a surface together, and sand is the part owners underestimate. Every wet foot crossing that deck carries grit, and grit turns a thin acrylic film into dust far faster than the sun alone ever would. Poured rubber has body to it. The wear layer is granule all the way through, not a skin painted over concrete, so abrasion takes off nothing anyone can see from a lounger. Salt does not attack it and the binder is moisture stable, which counts when your deck wakes up damp with spray most mornings. Up in the towers the constraint is logistics rather than chemistry. A service elevator window decides when material can move, and that shifts the day we book you rather than the price per foot we already quoted.

Pompano Beach neighborhoods we resurface decks in

Permits in Pompano Beach

Permit officeWhether a like for like resurfacing needs a permit depends on your municipality. We check your city before the work starts and put the answer in your written scope, so nothing stops mid job.
Our schedule25 minutes up from our Hollywood shop. Most Pompano Beach decks get measured the same week you call.

Questions from Pompano Beach

How much does a rubber pool deck cost in Pompano Beach?

Poured rubber starts at 8 dollars per sq ft installed. The number depends on how much prep your slab needs and how many colors you pick. You get a fixed written price after a free measurement, and if you already hold a comparable written quote we will beat it.

Do I need a permit to resurface a pool deck in Pompano Beach?

It depends on the municipality and on whether the work is like for like. We confirm the rule with your city before the job and state it in writing in your scope.

Can you pour over cracked concrete?

In most cases yes. Poured rubber bonds to the existing slab and bridges hairline cracks instead of telegraphing them. We grind, fill and prime first. If a slab has moved badly or sits on a failed base, we say so at the estimate rather than pour over a problem.

How hot does it get underfoot?

On a 91 degree afternoon a bare concrete deck hands your foot about 155 degrees. A light sand rubber deck hands it about 99. The full table with the arithmetic is here.

How long does the job take?

A typical residential deck runs 1 to 3 days on site and is walkable 24 to 48 hours after the final pour. Rain moves the schedule, since poured rubber needs dry weather to cure properly.

Get your fixed quote

Free on-site measurement within 24 hours. No obligation.

Free measurement within 24 hoursNo deposit at the estimate.
Fixed written priceThe quote you sign is the invoice you pay.
1 to 3 days on siteWalkable after 24 to 48 hours of curing.
2 year workmanship warrantyIn the contract before you pay anything.

We pour 3 decks a week. Slots this month go in Deck Check order.

✔ Free estimate ✔ No spam, ever ✔ Se habla español

CallPhoto quoteBook visit