Seamless surfaces with nowhere to trip
Sports surfaces

Poured rubber and polyurethane, no seams

One continuous surface mixed beside the job and laid straight onto your slab.

What goes wrong
  • Tile edges curling up into a trip hazard
  • Weeds and ants coming up through every joint
  • Patches that stand out like a scar
How we handle it
  • ✓No joints at all. One continuous pour, so nothing lifts and nothing catches a toe.
  • ✓Fall height rated. Thickness set to the equipment it sits under.
  • ✓Any shape. Curves, insets and logos poured in, not cut in.
  • ✓Repairable. A damaged spot is re poured and blends back in.
A seamless rubber and polyurethane surface is mixed wet on your site and laid as one continuous sheet, so there are no tiles and no joints anywhere in it. A bound rubber base carries the impact and a coloured top layer carries the wear. It cures on your existing concrete and is walkable after 24 to 48 hours.
from $8per sq ft installed
1 to 3 dayson site
24 hoursto your free measurement
2 yearsworkmanship warranty

How the pour is built

Two layers do two different jobs. The base is rubber granule mixed with binder in a paddle mixer beside the job, spread over a primed slab and troweled down while it is still live. That layer takes the impact. The wear layer goes on the same day, coloured granule bound in clear resin, closed off by hand so the finish reads even from edge to edge. Because both layers go down wet they knit into each other. There is no adhesive, no tape and no cut line anywhere in the field. Around drains, posts and pool coping the material is worked in tight to the detail, so water leaves the deck instead of finding a lip to sit behind.

Cut core through a poured rubber deck showing the black rubber base under the coloured wear layer
A core cut from a finished deck, black base below and the coloured top bonded straight onto it.

Rain, sun and grip

Our weather does the testing for us. An afternoon storm empties itself in minutes. A porous poured build lets that water pass down through the surface and away on the fall the slab already has, so you do not get standing puddles or the green slick that grows in them. The texture stays honest when it is wet, which matters most at a pool edge where people walk barefoot and in a hurry. Chlorine, salt spray and sunscreen all land on it and rinse off with a hose. Sun is the harder test, and this is where the build earns its money. Colour lives inside the granule, not in a paint film, so scuffs and washing do not take it off.

Bare foot on a wet poured rubber pool deck showing the surface texture
The same surface soaked with a hose, water draining through instead of sitting on top.

Thickness is a decision

There is no single correct depth. Under climbing equipment the depth is set by how far a child can fall from the highest part they can stand on, so the pour gets thicker as the equipment gets taller. A walkway, a lanai or a dog run needs none of that and paying for it is money burnt. A court sits in between and is chosen around how hard it gets used rather than how it looks. We check finished depth with a gauge while the crew is still on site, not after everyone has gone home. The number we measure is the number on your quote. If the slab dips somewhere, we say so before the mixer starts.

Depth gauge pushed into a freshly poured rubber surface to check finished thickness
Thickness checked on site while the pour is still open, against the figure on your quote.

How it works

Measuring the area with a laser1

Free on-site measurement

We visit within 24 hours, measure and hand you a fixed price.

Choosing the blend from granule samples2

Design and colour choice

Pick the blend and the depth. We repair the base so it holds.

Finished poured surface3

Installed in 1 to 3 days

Poured, cured and walkable in 24 to 48 hours.

What it costs

from $8per sq ft installed
✔ Base prep, crack treatment and priming included
✔ 2 year workmanship warranty included
✔ Fixed number after the free measurement
Already collecting quotes? Bring them to our visit. We go through them line by line, where they are padded, where they are fair, and where someone left out base prep that costs you in year two. You keep that breakdown either way.

Questions we get

How long before we can walk on it?

Walkable after 24 to 48 hours of curing, and most jobs are 1 to 3 days on site before that clock starts. Heat speeds it up and a wet week slows it down. We tell you at the measurement which day you get your yard back, and we do not hand over a surface that is still soft under a thumb.

Can you pour over the concrete we already have?

Usually yes. A sound slab is the cheapest base you will ever own, so we would rather repair it than remove it. Cracks get treated, low spots get filled and the whole surface gets primed so the rubber bonds instead of sitting loose on top. If the slab is broken up or still moving, we say that at the free measurement rather than pour over trouble.

Does it fade in the Florida sun?

The colour sits inside the rubber granule, not in a coating, so it cannot wash off or scrub off. Any surface taking this much sun shifts a little over years, and darker blends move less than very pale ones. We put samples down outdoors at the measurement, in your own daylight, so what you pick is what you will be looking at in August.

What does it cost and what is included?

Installed work starts at 8 dollars per sq ft. Base prep, crack treatment, priming, the pour and the finish all sit inside that number. You get a fixed written price after the free measurement, which we book within 24 hours, and the quote you sign is the invoice you pay. A 2 year workmanship warranty is written into the contract before you pay anything.

For the granule sizes and binder behind these builds, read rubber crumb surfaces.

Get your fixed quote

Free on-site measurement within 24 hours. No obligation.

Free measurement within 24 hoursNo deposit at the estimate.
Fixed written priceThe quote you sign is the invoice you pay.
1 to 3 days on siteWalkable after 24 to 48 hours of curing.
2 year workmanship warrantyIn the contract before you pay anything.

We pour 3 decks a week. Slots this month go in Deck Check order.

✔ Free estimate ✔ No spam, ever ✔ Se habla español

CallPhoto quoteBook visit