We resurface over your existing slab. No demolition.
30 minutes from our shop in Hollywood.
Local facts, not general promises








Poured rubber and stone carpet surfaces. 1.6 million sq ft placed by this crew since 2013, internationally.
A Sunrise board cannot vote on a handshake. Your amenity deck sits inside a seventies or eighties community where every dollar moves through an agenda, so the scope we hand you states the depth in inches, the prep, the color and the finished square footage before anyone raises a hand. That is the same sheet the treasurer files and the same sheet our crew builds from. Price starts at 8 dollars per sq ft installed and the number stops moving the day we finish measuring, so nobody has to re-vote in March because a contractor found something. The 2 year workmanship warranty is written into the contract, not printed on a brochure, which means a board reading it in a meeting knows exactly what it is buying. We are 30 minutes up from Hollywood, close enough to stand in front of that board and answer the prep questions in person.
A community pool deck in Sunrise never gets a quiet week. Residents cross it from open to close and chlorinated water lands on the same three feet of surface by the ladder every single day. Bare concrete drinks that in, and a thin acrylic coating starts lifting at the edges where the wet feet turn. Poured rubber is porous, so splash drains down through the surface instead of standing on it, and the binder holds up under sun and moisture rather than chalking out on you. On a shared deck the calendar matters as much as the finish. Most of these run 1 to 3 days on site and the surface is walkable after 24 to 48 hours of curing, so an association is not shutting its amenity area for a month. We pour over the existing slab, which means no jackhammers at seven in the morning and no dumpster eating resident parking.
Poured rubber starts at 8 dollars per sq ft installed. The number depends on how much prep your slab needs and how many colors you pick. You get a fixed written price after a free measurement, and if you already hold a comparable written quote we will beat it.
It depends on the municipality and on whether the work is like for like. We confirm the rule with your city before the job and state it in writing in your scope.
In most cases yes. Poured rubber bonds to the existing slab and bridges hairline cracks instead of telegraphing them. We grind, fill and prime first. If a slab has moved badly or sits on a failed base, we say so at the estimate rather than pour over a problem.
On a 91 degree afternoon a bare concrete deck hands your foot about 155 degrees. A light sand rubber deck hands it about 99. The full table with the arithmetic is here.
A typical residential deck runs 1 to 3 days on site and is walkable 24 to 48 hours after the final pour. Rain moves the schedule, since poured rubber needs dry weather to cure properly.
Free on-site measurement within 24 hours. No obligation.