We resurface over your existing slab. No demolition.
40 minutes from our shop in Hollywood.
Local facts, not general promises








Poured rubber and stone carpet surfaces. 1.6 million sq ft placed by this crew since 2013, internationally.
Surge is not theoretical on Key Biscayne, and what counts afterwards is how quickly a surface returns to use. Standing water is what finishes a rigid coating off. It works under the film, takes it away in plates and leaves something that has to be stripped rather than cleaned, and on an island that happens on every side of the property at once. A poured rubber wear layer is porous. Water passes through it instead of sitting on top, so once the yard dries the deck usually wants a rinse and nothing more. That covers the surface. It does not cover a slab that has dropped, and where the concrete itself holds a dish, you hear that during the free measurement and the levelling takes its own line on the quote, since pouring a porous layer over a low spot leaves the water precisely where it was. Which of the two you own gets settled on site.
Few places put an amenity deck and a private pool surround this close together, and the two run on different clocks. A house gets measured, priced at one fixed number and started. A building has to pass through people who were never at the measurement, so what goes to a manager is a document written to be voted on, thickness specs and warranty terms already inside it, nothing left over to be asked for two weeks later. The pour is identical either way, same crew and same material. Phasing is where they part. On an amenity deck a barefoot route to the water stays open at every stage and the surface closes in sections, while a private deck runs 1 to 3 days start to finish. Sitting 40 minutes out means the crew arrives loaded for the whole run and works it through, instead of dripping in and out across a week.
Poured rubber starts at 8 dollars per sq ft installed. The number depends on how much prep your slab needs and how many colors you pick. You get a fixed written price after a free measurement, and if you already hold a comparable written quote we will beat it.
It depends on the municipality and on whether the work is like for like. We confirm the rule with your city before the job and state it in writing in your scope.
In most cases yes. Poured rubber bonds to the existing slab and bridges hairline cracks instead of telegraphing them. We grind, fill and prime first. If a slab has moved badly or sits on a failed base, we say so at the estimate rather than pour over a problem.
On a 91 degree afternoon a bare concrete deck hands your foot about 155 degrees. A light sand rubber deck hands it about 99. The full table with the arithmetic is here.
A typical residential deck runs 1 to 3 days on site and is walkable 24 to 48 hours after the final pour. Rain moves the schedule, since poured rubber needs dry weather to cure properly.
Free on-site measurement within 24 hours. No obligation.